After being parked on the street for about a week, we found it necessary to try to park our motorcoach on the existing gravel driveway as a temporary fix until such time as we could have the upgraded work done on the gravel. We really did not want to take advantage of our neighbors any longer and felt this was a means to an end for the time being.
In order to do this, we had one of our friends sit on top of the coach in order to lift up the telephone wires since they hanging lower than we would have wanted. We had another friend watching for any bottoming out which was a major concern due to the pitch of the driveway. Lee was backing her in as carefully as he could. We all held our breath and were relieved when our new motorcoach was sitting in its new home at least temporarily.
We would not be physically moving our coach until we scheduled some warranty work at the local dealership. Our original thoughts were that we were going to be able to live in our coach during our household renovations. All our bathrooms were ripped out. It would have been an easy fix to live in the coach. Now that we were unable to make any "dumps", we had no choice but live in a hotel for a few weeks.
With our son's upcoming graduation, warranty issues to be addressed, day to day monitoring of renovation progress, upgrading our driveway situation, and the general day to day "stuff", we had alot on our plate.
It was time to think about Florida and our Life in the Slow Lane!!!!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment